How Long Does It Take To Get A Septic Tank Permit In? (Solved)

Once your application is confirmed as complete you should expect it to take at least 4 months to get a decision. How long does it take to get a septic permit? Staff typically complete initial review and pre-site inspection for isolation distances and other requirements within 3-5 working days. Additional time may be required if […]

How Is A Septic Tank Lid Sealed? (TOP 5 Tips)

What are the parts of a septic tank? A septic system consists of two main parts-a septic tank and a drainfield. The septic tank is a watertight box, usually made of concrete or fiberglass, with an inlet and outlet pipe. Wastewater flows from the home to the septic tank through the sewer pipe. Do septic […]